Project - Texas Roadhouse

The old roof system was replaced with 11 sq of 60 mill Rubber roof.  A knee wall was added and 1/2" fiberboard.  In addition, the project required the detachment and reset of three A/C units.  The job was finished off with the addition of 3x3 gutter apron on the parking lot side of the establishment.

Project - Pat Meyer

This project entailed a new roof, siding, and a complete remodel of the basement.  All the wood work was custom built on site.  The old fire place was torn out, and hand built shelves installed around the newly installed fireplace.  A 1/2 bath was installed, new carpet in the stairwell area, and two custom built barn style doors on a track system.  A nice wood finished product was also installed over the old concrete floor.